Pile Repair Works At The Industrial Terminal

Industrial Terminal for UTE-TR PHB Jordan

Barracuda Diving & Marine Service completed an existing jetty survey, sulphur dredging and pile repairs

Sep – Present

Works Completed:

  • Pile Repairs.
    Clean and paint all the existing piles.
  • Remove Cathodic Protection System
  • Remove & Install Bollards and Fenders

Go to GALLERY

  • Sulphur Dredging.
    Removed Sulphur from area around the existing Jetty using a grab. Divers surveyed the area once works completed.
  • Industrial Terminal Existing Jetty Survey.
    Three thickness measurements were taken of every pile and photographic reports, showing the full condition of the piles, were submitted. 

 Link to UTE TR PHB Jordan